Technical review of the Main Design for the E75 motorway on Corridor X, Section: Kelebija - Subotica Interchange South |
22.30 |
Technical review of the Main Design for the motorway Belgrade-Požega, Section: Boljkovci - Takovo |
12.57 |
Technical review of the Main Design for the state road M-21 Novi Sad - Ruma - Šabac extending from the state road M-19 Šabac - Loznica, Section 1: Jarak (E-70 motorway) - Hrtkovci, from km 36+300 to km 48+300 L=12km |
12.00 |
Technical review of the Main Design for Sector 6 of the Belgrade Bypass, from km 588+916.30 to km 598+489.89, to the end of the Straževica Tunnel, Bubanj potok Interchange included, L=9.59km |
9.59 |
Technical review of the Main Design for Phase 2 of the motorway E-75 Belgrade – Niš – Skoplje, Section: Bukurevac – FYROM border, from km 965+996.51 to km 976+250.30 |
10.25 |
Technical review of technical documentation - Main Design for the motorway E-75 Beograd – Niš – FYROM border, Section: Srpska kuća – Levosoje km 934+354.73 – km 942+413.13, - amendments. |
8.06 |
Technical review of technical documentation - Detailed Design, amendments to the Main Design for extension - completion of works on construction of the motorway E-80 Niš –Dimitrovgrad, sector 6 (Pirot - Sukovo), km 81+450.00 – km 87+447.73 |
6.00 |
Technical review of technical documentation - Detailed Design, amendments to the Main Design for extension - completion of works on construction of the motorway E-80 Niš –Dimitrovgrad, sector 8 (Dimitrovgrad bypass) from km 92+905.55 to km 101+587.00 (from km 95+788.494 to km 104+466.946) |
8.68 |
Technical review of technical documentation - Main design for the road M-21 Novi sad – Ruma – Šabac extending from the road M-19 Šabac Loznica, Section 2: Hrtkovci – the Sava River, from km 49+199.82 (12+899.82) to km 57+444.98 (21+444.98), L=8.3km |
8.30 |
Technical review of technical documentation - Design for building permit - Relocation of the state road IB 22 (old designation M-22) Belgrade-Ljig, in the zone of surface mines in the Kolubara basin |
7.25 |
Technical review of the Main design for the state road IIB 363 |
|